San Clemente Shoreline Project

Project Overview

• U.S. Army Corps of Engineers (USACE) Project will create a new, 50-foot wide beach sand berm
• Project footprint is approximately 3,214 feet long + tapers
• Volume of sand added to the beach = 251,000 cubic yards
• Sand will be placed between Linda Lane & T – Street
• Sand renourishment cycle is every approximately every 6 years
• Final renourishment event would occur in 2073/74 (e.g., in 50 years)
• 2 Million cubic yards will be placed over the 50-year period

 

Project Updates

11/15/24 More than 20,000 cubic yards of sand have been delivered south of the pier! Sand deliveries are expected to move to the north side of the pier beginning next week. The public is reminded for safety to please avoid construction areas.
10/24/24 Beach Sand Replenishment Project Near Pier Resumes

5/31/24 Update: The first phase of the San Clemente Shoreline Sand Replenishment Project is now complete! A total of 251,000 cubic yards of sand is scheduled to be dredged and placed between Linda Lane and T-Street beaches in this placement cycle. Approximately half of that quantity has been successfully dredged and placed, with the remaining quantity planned to be delivered this fall. 
First Phase Before and After:

05/23/24 First Phase Complete for San Clemente Shoreline Sand Replenishment Project
05/02/24 San Clemente Shoreline Sand Replenishment Project Update
04/26/24 The San Clemente Shoreline Sand Replenishment Project is back underway!
04/19/24 Construction Mobilization Related to Re-Start of Sand Replenishment Project
03/20/24 San Clemente Shoreline Sand Replenishment Project to Restart in Spring
02/15/24 San Clemente Shoreline Sand Replenishment Project Update 
01/24/24 San Clemente Shoreline Sand Replenishment Project Update
12/18/23 Press Conference Video Recognizing the San Clemente Shoreline Sand Replenishment Project Kickoff
12/13/23 Press Conference Scheduled to Recognize San Clemente Shoreline Sand Replenishment Project Kickoff
12/11/23 Beach Restoration Sand Deliveries Begin as Early as December 15
12/06/23 Next Phase of Beach Sand Project Pre-Construction Mobilization
11/21/23 San Clemente Shoreline Sand Replenishment Project Begins with Pipeline Placement Near Pier

What can I expect during construction?
Project Description
Project Funding
Frequently Asked Questions


North Beach Sand Replenishment Project

Project Overview:

  • 37,000 cubic yards of beach-quality sand, sourced from the Santa Ana River (Costa Mesa/Fountain Valley), to bolster the function of the sandy beach as a natural shoreline buffer to protect critical public infrastructure and existing structures.
  • The first truckloads of sand began arriving July, 2024 and completed in October, 2024.

Project Updates

10/2/24 Sand Deliveries Complete in North Beach Sand Replenishment Project
9/6/24 Approximately 20,000 cubic yards of sand have been added so far to North Beach!
8/27/24 Take an inside look at the North Beach Sand Replenishment Project! More than 1,000 truckloads have been delivered so far making the project approximately 35% complete. 
08/09/24 The North Beach Sand Replenishment Project is off to a great start! More than 100 truckloads of sand have been delivered to the beach!
06/28/24 City Announces the Start of the North Beach Sand Replenishment Project

What can I expect during construction?