Inspections
Schedule an Inspection by Phone at (949)361-3366
Job-site Inspection Visits
You will need to request on-site inspections at various stages of the construction process to make certain the work conforms to the codes. It is important not to cover your work until it has been inspected by the City. Inspection approvals will be recorded by the building inspector on the inspection job card. It is also important to have the plans and the inspection job card available for the building inspector when they arrive on the job site.
(Be prepared to provide your Permit Number and your Inspection Code, see below for listing)
Please note:
- AM Inspections are scheduled for time slot 8:30am to 12:00pm
- PM Inspections are scheduled for time slot 12:30pm to 3:30pm
- BI-2 Building Inspectors
Inspection Code and Inspection Type
CODE | INSPECTION TYPE |
101 | PRECONSTRUCTION MEETING |
102 | FORM SETBACK AND PAD CERT/SOILS MEMO |
103 | FOOTINGS/STEEL/HARDWARE |
104 | PRE-SLAB |
105 | FLOOR SHEATHING |
106 | 1ST FL WALL FR/SHR WALLS/HDS |
107 | 2ND FLOOR SHEATHING |
108 | 2ND FL WALL FR/SHR WALLS/HDS |
109 | 3RD FLOOR SHEATHING |
110 | 3RD FLR WALL FR/SHR WALLS/HDS |
111 | ROOF SHEATHING/DIAPHRAGM |
112 | FINAL FRAMING |
113 | PRE-LATH |
114 | EXTERIOR LATH |
115 | STUCCO/SCRATCH COAT |
116 | INSULATION/FLOOR/WALLS/RF-CEILING |
117 | DRYWALL |
118 | INTERIOR LATH/SHOWER PAN |
119 | SUSPENDED CEILINGS/T-BAR |
120 | CAGES / CAISSONS |
121 | ROOF TEAR-OFF /PRE-SHEATHING |
122 | SMOKE DETECTORS |
198 | 198-SW INITIAL INSPECTION |
199 | 199-SW FINAL** |
201 | ROUGH MECHANICAL (HEATING/VENTS) |
222 | MECHANICAL FINAL |
301 | UFER GROUND |
302 | UNDERGROUND ELECTRICAL |
303 | ROUGH ELECTRICAL |
304 | TEMPORARY POWER (RELEASED) |
305 | ELECTRICAL RELEASE |
333 | ELECTRICAL FINAL |
401 | UNDERGROUND WASTE/CLEANOUTS |
402 | UNDERGROUND WATER SUPPLY/DRAINAGE |
403 | UNDERGROUND GAS LINE PE/GAS TEST |
404 | ROUGH PLUMBING/TOP-OUT |
408 | WATER SERVICE |
409 | GAS TEST FINAL |
410 | SEWER CONNECTION |
411 | ROOF DRAINS/GUTTERS |
412 | GAS RELEASE |
444 | PLUMBING FINAL |
501 | POOL PRE-GUNITE |
502 | POOL U/G ELECTRIC |
503 | POOL GAS PIPE TEST |
504 | POOL P-TRAP/BACKWASH LINE |
505 | POOL EQUIP WALL FOOTING |
506 | POOL EQUIP WALL PRE-GROUT |
507 | POOL PRE-DECK /BONDING |
508 | POOL PRE-PLASTER |
555 | POOL/SPA FINAL |
601 | RETAINING WALL FOUNDATION |
602 | RETAINING WALL STEEL/PRE-GROUT |
603 | WALL WATERPROOFING |
604 | WALL DRAINAGE |
605 | BACKFILL COMPACTION |
701 | PATIO COVER / DECK -FOOTINGS |
702 | PATIO COVER /DECK-FRAMING |
703 | MASONRY WALL/FIREPLACE FOOTINGS |
704 | MASONRY WALL/FIREPLACE PRE-GROUT |
705 | EROSION CONTROL/BMP INSPECTION 1 |
706 | EROSION CONTROL/BMP INSPECTION 2 |
999 | BUILDING FINAL |
Final Approval
The Building Division will provide final approval when construction is complete and code compliance is verified. You will then have the personal satisfaction of a job done right. Property Owners can enjoy their new surroundings with the peace of mind and the knowledge that they meet the safety standards in your community.