Inspections

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

 Scheduled Inspections

Schedule an Inspection by Phone at (949)361-3366

Job-site Inspection Visits
You will need to request on-site inspections at various stages of the construction process to make certain the work conforms to the codes. It is important not to cover your work until it has been inspected by the City. Inspection approvals will be recorded by the building inspector on the inspection job card. It is also important to have the plans and the inspection job card available for the building inspector when they arrive on the job site.

(Be prepared to provide your Permit Number and your Inspection Code, see below for listing)

Please note:

  • AM Inspections are scheduled for time slot 8:30am to 12:00pm
  • PM Inspections are scheduled for time slot 12:30pm to 3:30pm 
  • BI-2 Building Inspectors

Inspection Code and Inspection Type

CODE INSPECTION TYPE
101 PRECONSTRUCTION MEETING
102 FORM SETBACK AND PAD CERT/SOILS MEMO
103 FOOTINGS/STEEL/HARDWARE
104 PRE-SLAB
105 FLOOR SHEATHING
106 1ST FL WALL FR/SHR WALLS/HDS
107 2ND FLOOR SHEATHING
108 2ND FL WALL FR/SHR WALLS/HDS
109 3RD FLOOR SHEATHING
110 3RD FLR WALL FR/SHR WALLS/HDS
111 ROOF SHEATHING/DIAPHRAGM
112 FINAL FRAMING
113 PRE-LATH
114 EXTERIOR LATH
115 STUCCO/SCRATCH COAT
116 INSULATION/FLOOR/WALLS/RF-CEILING
117 DRYWALL
118 INTERIOR LATH/SHOWER PAN
119 SUSPENDED CEILINGS/T-BAR
120 CAGES / CAISSONS
121 ROOF TEAR-OFF /PRE-SHEATHING
122 SMOKE DETECTORS
198 198-SW INITIAL INSPECTION
199 199-SW FINAL**
201 ROUGH MECHANICAL (HEATING/VENTS)
222 MECHANICAL FINAL
301 UFER GROUND
302 UNDERGROUND ELECTRICAL
303 ROUGH ELECTRICAL
304 TEMPORARY POWER (RELEASED)
305 ELECTRICAL RELEASE
333 ELECTRICAL FINAL
401 UNDERGROUND WASTE/CLEANOUTS
402 UNDERGROUND WATER SUPPLY/DRAINAGE
403 UNDERGROUND GAS LINE PE/GAS TEST
404 ROUGH PLUMBING/TOP-OUT
408 WATER SERVICE
409 GAS TEST FINAL
410 SEWER CONNECTION
411 ROOF DRAINS/GUTTERS
412 GAS RELEASE
444 PLUMBING FINAL
501 POOL PRE-GUNITE
502 POOL U/G ELECTRIC
503 POOL GAS PIPE TEST
504 POOL P-TRAP/BACKWASH LINE
505 POOL EQUIP WALL FOOTING
506 POOL EQUIP WALL PRE-GROUT
507 POOL PRE-DECK /BONDING
508 POOL PRE-PLASTER
555 POOL/SPA FINAL
601 RETAINING WALL FOUNDATION
602 RETAINING WALL STEEL/PRE-GROUT
603 WALL WATERPROOFING
604 WALL DRAINAGE
605 BACKFILL COMPACTION
701 PATIO COVER / DECK -FOOTINGS
702 PATIO COVER /DECK-FRAMING
703 MASONRY WALL/FIREPLACE FOOTINGS
704 MASONRY WALL/FIREPLACE PRE-GROUT
705 EROSION CONTROL/BMP INSPECTION 1
706 EROSION CONTROL/BMP INSPECTION 2
999 BUILDING FINAL

 

Final Approval

The Building Division will provide final approval when construction is complete and code compliance is verified. You will then have the personal satisfaction of a job done right. Property Owners can enjoy their new surroundings with the peace of mind and the knowledge that they meet the safety standards in your community.